TOKNITH
Applications

Design before committing.

Compare alternatives before construction or implementation. A facility and a network are both physical systems that behave in time.

Evaluate

  • Layouts
  • Locations
  • Capacity
  • Equipment
  • Movement
  • Resource requirements
  • Facility configurations
  • Network structures

A layout is a set of consequences.

Where something sits determines how far people and equipment travel. Travel determines congestion. Congestion determines cycle time. Cycle time determines how much labor and equipment the operation needs.

TOKNITH models those consequences rather than evaluating a drawing on its own terms.

Compare designs by running them, not by comparing their dimensions.

The design question

  • Which configuration performs best under expected demand?
  • What happens to that answer at peak?
  • What would have to change to make the alternative work?

One clock. One model. Many futures. One reality.

Model the operation. Rehearse the change. Connect it to reality.

Request a Demo